Images from deep inside Japan's Fukushima nuclear plant show daunting scale of clean-up job

Images taken by miniature drones from deep inside a badly damaged reactor at the Fukushima nuclear plant show displaced control equipment and misshapen materials but leave many questions unanswered, underscoring the daunting task of decommissioning the plant.

The 12 photos released by the plant's operator are the first from inside the main structural support called the pedestal in the hardest-hit No. 1 reactor's primary containment vessel, an area directly under the reactor's core. Officials had long hoped to reach the area to examine the core and melted nuclear fuel which dripped there when the plant's cooling systems were damaged by a massive earthquake and tsunami in 2011.

Earlier attempts with robots were unable to reach the area. The two-day probe using tiny drones was completed last week by Tokyo Electric Power Company Holdings, or TEPCO, which released the photos on Monday.

https://www.cbsnews.com/news/fukushima-nuclear-disaster-japan-drone-photos-deep-inside-reactor-1-meltdown/
ex - I'm not going to live with you through one more fishing season!
me -There's a season?

Pastor explains icons to my son: you know like the fish symbol on the back of cars.
My son: My dad has two fish on his car and they're both trout!

Woolly Bugger

Current State of Post-Accident Operations at Fukushima Daiichi Nuclear Power Station


...The removal of fuel debris has been delayed. Experimental removal using a removal device (a folding robot arm of 22m in length) originally scheduled in the Mid-term Roadmap to take place in Unit 2 in FY2021 has been delayed (for the third time) until October 2024. Having been delayed due to the COVID-19 infection and then malfunctioning of the removal device, trouble has also been experienced opening the reactor vessel penetration hatch (X-6 penetration) to be used to insert the device. The hatch having been opened, it was found that cables, etc. inside the penetration, which melted during the accident, have fused and are lying in a heap. TEPCO built a device to push away the accumulated material using machinery and water (scheduled to be completed at the end of FY2023). The plan now is to use an experimental telescopic-type removal device, differing from the robot arm removal device, that can be inserted into the hatch without removing the accumulated material. This device will be used to extract debris on an experimental basis by October, and then from the end of FY2024 through to FY2025 the robot arm removal device will also be used to extract debris. In addition, investigations are ongoing due to water level reductions occurring in the Unit 1 pressure containment vessel (PCV) and Unit 3 PCV and suppression chamber.


https://cnic.jp/english/?p=7057

This detailed report shows that they still don't know how they are going to clean up this nightmare!
ex - I'm not going to live with you through one more fishing season!
me -There's a season?

Pastor explains icons to my son: you know like the fish symbol on the back of cars.
My son: My dad has two fish on his car and they're both trout!